BRIGHTON APARTMENTS: STRATA MULTI-LEVEL APARTMENT COMPLEX NTH FREMANTLE WA
Our client is a strata-managed luxury, high-rise apartment block situated on the banks of the Swan River.
The strata were keen to offset electricity costs in the common areas such as foyer and swimming pool. By installing a solar power system, they have reduced future energy costs and added value to the building.
Solution: 18KW Solar Power System
Equipment: 60 x Solar Panels and 1 x 15KW Inverter
Estimated Annual Energy Output: 25,803kWh
Annual CO2 Reduction: 20,126kg
ANNUAL ENERGY SAVINGS: $6,709




ERCEG HOLDINGS : FRUIT/ VEGETABLE WHOLESALER DONNYBROOK WA
Our client is a leader in the industry, supplying fresh fruit and vegetables to Perth and the rest of WA.
With a genuine love for the environment, they saw sense in harnessing the natural energy of the sun to produce power and reduce their bills.
Our cash -flow positive solution resulted in almost $20,000 in annual savings in the first year which they can use to grow their business.
Solution: 40KW Solar Power System
Equipment: 122 x Solar Panels and 2 x 15KW Inverters
Estimated Annual Energy Output: 55,504kWh
Annual CO2 Reduction: 43,293kg
ANNUAL ENERGY SAVINGS: $19,765




LD TOTAL: LANDSCAPE ARCHITECTS BURSWOOD WA
Our client is a multi-award winning landscape company offering a full range of services from landscape and irrigation design to construction and ongoing maintenance.
With a bustling office and 9 to 5 working day, they are the perfect candidate for a combined approach of reduce and produce. By installing LED lighting and a solar power system, they have future-proofed their business against rising energy costs.
Our cash -flow positive solution resulted in $26,000 in annual savings in the first year which they can use to grow their business.
Solution: 40KW Solar Power System and LED Lighting
Equipment: 122 x Solar Panels and 2 x 15KW Inverters
LEDs: 168 x Panel, 74 Tube and various external
Estimated Annual Energy Output: 56,339kWh
Annual CO2 Reduction: 67,006kg
ANNUAL ENERGY SAVINGS: $26,046




CONCERT & CORPORATE PRODUCTIONS: PRODUCTION COMPANY BELMONT WA
Our client is Western Australia’s leading production company. They specialise in automated lighting, audio visual, LED screens, operators, rigging, staging, technical support and sales and service and light up some of WA’s biggest festivals.
The office and warehouse are custom configured for business purposes and have been expanding since 2005. Management were looking for a cost-effective way to control energy costs in the future.
Solution: 19.98KW Solar Power System
Equipment: 74 x Solar Panels and 1 x 15KW Inverter
Estimated Annual Energy Output: 29,610kWh
Annual CO2 Reduction: 23,096kg
ANNUAL ENERGY SAVINGS: $8,827




MAXICOAT: POWDER COATING MALAGA WA
Our client provide powdercoating services to commercial and industrial customers as well as the general public. They have been in operation for over 15 years and pride themselves on quality workmanship and reliability.
The factory operates from 6:30 am, 5 days per week and includes large ovens which use high amounts of energy. Installing solar power has allowed them to offset a large percentage of daily business consumption.
Solution: 39.65KW Solar Power System
Equipment: 122 x Solar Panels and 2 x 15KW Inverter
Estimated Annual Energy Output: 58,868kWh
Annual CO2 Reduction: 45,917kg
ANNUAL ENERGY SAVINGS: $18,814



